Guangzhou Metro Line 2 Construction Time

On February 21, 2000, Haizhu Square Station, the first station of Guangzhou Metro Line 2, started construction; On March 30th, Haizhu Square Station was capped. On September 5, 2001, the track-laying project of Guangzhou Metro Line 2 started at the track-laying base in front of the park. On November 29th, 2002, the first train of Guangzhou Metro Line 2 arrived at Guangzhou Baiyun International Airport. On December 29th, the first section of Guangzhou Metro Line 2 (Sanyuanli Station-Xiaogang Station) started trial operation. The section is 8.9 kilometers long. On June 28, 2003, the section from Xiaogang to Pazhou was opened, and the length of Guangzhou Metro Line 2 (Sanyuanli Station-Pazhou Station) reached 18.28 kilometers. On November 28th, the first domestic train of Guangzhou Metro Line 2 rolled off the assembly line in Changchun. On December 26, 2005, Wanshengwei Station was opened, and the second phase of Guangzhou Metro Line 2 (Pazhou Station-Wanshengwei Station) was officially put into operation. On June 6, 2006, the 1000th subway vehicle arrived at Chisha Depot. On April 9, 2007, the dismantling project of Guangzhou Metro Line 2 and Guangzhou Metro Line 8 started. On May 25th, 2009, the first new trains of Guangzhou Metro Line 2 and Guangzhou Metro Line 8 rolled off the assembly line; On July 19th, the tunnels of Guangzhou Metro Line 2 and Guangzhou Metro Line 8 were completed, which marked the completion of all the tunnels of Guangzhou Metro Line 2 and Guangzhou Metro Line 8. On January 18th, 2010, the first additional trains of Guangzhou Metro Line 2 and Guangzhou Metro Line 8 were put into use; On March 22nd, the short track of Guangzhou Metro Line 2 was completed. On March 30th, the power supply equipment of Guangzhou Metro Line 2 was hoisted. On April 30th, the first cold sliding test of Jiahe Depot was successful; On June 16th, the north extension of Guangzhou Metro Line 2 began to slide hot; From September 22nd to September 24th, the service of the old Guangzhou Metro Line 2 (Sanyuanli Station-Wanshengwei Station) was suspended to meet the need of dismantling and joint commissioning of Guangzhou Metro Line 2; On September 25th, the original Guangzhou Metro Line 2 was split into two independent new lines, Guangzhou Metro Line 2 and Guangzhou Metro Line 8, and the traffic line of Guangzhou Metro Line 2 was changed (Jiahe Wanggang Station-Guangzhou South Railway Station). On January 8th, 2013, Guangzhou Metro Line 2 was opened at the peak of working days. (Sanyuanli Station-Jiang Tai Station) From January 8, 2017, Guangzhou South Station of Guangzhou Metro Line 2 will normally extend its servic:00, and stops at five stations: Luoxi Station, Changgang Station, gongyuanqian station Railway Station, Guangzhou Railway Station and Jiahe Wanggang Station.


在《Guangzhou Metro Line 2 Construction Time》上留下第一个评论

Deep China Travel