1. The installation of kitchen utensils should be carried out after the kitchen decoration and sanitation work are all ready. 2. The installation of kitchen utensils requires professionals to measure, design and ensure the correct size. Level of kitchen utensils and hanging cabinets (with adjusting feet under the kitchen utensils). Silicone is used as waterproof treatment at the joint of gas appliance and table top to prevent water leakage. 3. Safety, check whether the kitchen hardware (hinges, handles, rails) are installed firmly, and whether the hanging kitchen is installed firmly. The installation of kitchen equipment is highly professional and technical, and its installation proc: wall and ground treatment, product acceptance, Changsha kitchen equipment installation of cabinets, water supply and drainage, installation of supporting electrical appliances, testing and adjustment. Precautions :1, adjust the horizontal knob when installing the lower cabinet, and the countertops and front faces of each cabinet should be on a horizontal plane; When the two cabinets are connected, wooden screws should be used. In case of pipelines, valves, etc. on the back, lines should be punched in the back plate to avoid relevant equipment, and there should be no sawtooth phenomenon on the side of the hole. Precautions: :2, the connection gap between the remaining panels of the sink should be symmetrical, and th:3, when installing the faucet, you can directly punch holes in the stainless steel plate, and the installation requirements are firm, and the connection part is not allowed.