When will the expressway open to traffic?

The Guangming Expressway project is divided into four phases. The first phase starts from Xiqiao Town, Nanhai District, and runs across Gaoming, passing through Hecheng Town, Mingcheng Town and Genglou Town, Gaoming District, with a total length of 42.1 kilometers. The whole line adopts the standard of two-way six-lane expressway with a design speed of 100 kilometers per hour, with a total investment of 3.14 billion yuan. It was opened to traffic on June 25, 2019. It is the first expressway in Gaoming District and the parallel section of Guanfo Expressway in the national expressway network, numbered G9411. The Xiqiao-Genglou section of the first phase project of Guangzhou-Gaoming Expressway with a total length of 42 kilometers was officially opened to traffic on the morning of June 25, 2019. Become the first expressway in Gaoming District. In the future, the time and space distance between Gaoming and the core area of Guangfo and even the Pearl River Delta will be greatly shortened. It is reported that there are 6 toll stations in the first phase of the whole line, and the car 25 yuan can complete the journey. At the same time, the second phase of Guangming Expressway (Chencun to Xiqiao section) starts from Wujiawei, Chencun Town, Shunde District, Foshan City, and ends at Dagang Village, Xiqiao Town, Nanhai District, connecting Xiqiao to Genglou Xianyong section. The total length of the route is about 42.364 kilometers, passing through Chencun Town, Beijiao Town, Lecong Town, nanzhuang town in Chancheng District, Danzao Town and Xiqiao Town in Nanhai District. The whole line is designed with a speed of 100 km/h and six lanes in both directions. It is planned to be completed and opened to traffic in December 2019. The section from Xiqiao to Genglou of Guangming Expressway starts from the West Second Ring Expressway, passes through Xiqiao Town of Nanhai District, Baini Town of Sanshui District, lotus town Street, Mingcheng Town and Genghe Town of Gaoming District, intersects with Gaoming Section of Jiangzhao Expressway and ends at Baishi Town of Genghe Town of Gaoming District. The total length is about 42 kilometers, and it is a two-way six-lane design with a total investment of 3.14 billion yuan. It is understood that there are six toll stations along the first phase of Guangming Expressway (Xiqiao to Genglou section), including Dagang, Jinbai, lotus town, Cangjiang, Mingcheng and Baishi Tongwei, among which Dagang toll station will be seamlessly connected with the West Second Ring Expressway. According to the relevant documents of the Provincial Price Bureau, the toll standards for vehicles of Class I to Class V are 25, 40, 50, 75 and 90 yuan/train. This means that small vehicles such as cars and jeeps, which belong to the first class of vehicles, need 25 yuan once to complete the journey, and the charging standard is equivalent to that of Guangfo Expressway. The second phase starts from Wujiawei, Chencun Town, Shunde District, Foshan City, and ends at Dagang Village, Xiqiao Town, Nanhai District, with a total length of about 42.36 kilometers, passing through Beijiao Town, Lecong Town, nanzhuang town, Chancheng District and Danzao Town, Nanhai. The design speed of the whole line is 100 km/h, with two-way and six lanes. Construction started in June 2019 with a total investment of about 7.5 billion yuan. The third phase starts from Hualong Interchange of Guangzhou-Zhuhai North Line Expressway, uses the original Jinshan Avenue in Panyu District, passes through Nancun Town and Zhongcun Town, and ends at Wujiawei, Chencun Town, Shunde. The total length is 30.8 kilometers, and the design speed is 100 kilometers per hour. The whole line is built according to the standard of six-lane expressway. The total investment of the project is estimated to be about 5.8 billion yuan, and it was started on December 22, 2019. The West Extension Section (Phase IV) starts from Baishi, Genghe Town, Gaoming District, passes through Wanwu and Chuantian, and finally connects Gaocun with Shenluo Expressway. It is 19.7 kilometers long and has six lanes in both directions. The design speed is 100 kilometers per hour, and the project investment is estimated to be about 1,803.6 million yuan. In May 2019,Construction started on the 1 ST and was opened to traffic on December 27, 2019. Toll stations and service points of Guangming Expressway (S5) Hualong G4W, Panyu District, Guangzhou, G1501 Guangzhou East Second Ring Expressway has not been opened Cangjiang 297 County Road Qixinggang S105 Nansha Port Expressway Xianzhuang Panyu Avenue North Xinguang Xinguang Expressway Qifu Guanglu Pingshan S39 Dongxin Expressway Foshan Shunde Wujiawei S43 Guangzhou-Zhuhai West Line Expressway Chencun Fochen Road Xijiao S82 Foshan First Ring Expressway 519 County Road Lecong Foshan Avenue Nanlecong Avenue Yangjiao. Hejiao Avenue Foshan Chancheng District Xingtou S15 Fokai Expressway Rogge S82 Foshan First Ring Expressway Gaotian 515 County Road Foshan Nanhai District Qiaojin Avenue Baidong 269 Provincial Highway Dagang G15, G1501, G9411 Guangzhou West Second Ring Expressway Jinbai 269 Provincial Highway westbound in Sanshui District, Foshan City 362 Provincial Highway Songgang Service Area, Gaoming District, Foshan City Cangjiang Chengdong Road Tanlang G94 Jiangzhao Expressway Guanfo Expressway (G9411) End point Mingcheng Zhaojiang Highway is more in harmony with Donghe Avenue, Xihe Avenue and Gaocun Expressway is not opened.


在《When will the expressway open to traffic?》上留下第一个评论

Deep China Travel