When we removed the cover plate for the construction team before, there was indeed a construction team to calculate the money with us. Usually, the total 1 yuan/meter is given according to the disassembly and assembly. After all, this job is a worthless job. There is no such thing as “a. The demolition of the “a refers to the demolition of the entire trunking, so the demolition “a cannot be used to set the price.